Penjadwalan Produksi dengan Menggunakan Metode Campbell, Dudek and Smith (CDS) untuk Meminimumkan Makespan dan Lateness pada CV. Duamatek

Kartono, Wilson (0855008) (2013) Penjadwalan Produksi dengan Menggunakan Metode Campbell, Dudek and Smith (CDS) untuk Meminimumkan Makespan dan Lateness pada CV. Duamatek. Undergraduate thesis, Universitas Kristen Maranatha.

[img]
Preview
Text
0855008_Abstract_TOC.pdf - Accepted Version

Download (135Kb) | Preview
[img] Text
0855008_Appendices.pdf - Accepted Version
Restricted to Repository staff only

Download (17Kb)
[img]
Preview
Text
0855008_Chapter1.pdf - Accepted Version

Download (171Kb) | Preview
[img] Text
0855008_Chapter2.pdf - Accepted Version
Restricted to Repository staff only

Download (305Kb)
[img] Text
0855008_Chapter3.pdf - Accepted Version
Restricted to Repository staff only

Download (167Kb)
[img] Text
0855008_Chapter4.pdf - Accepted Version
Restricted to Repository staff only

Download (1107Kb)
[img]
Preview
Text
0855008_Conclusion.pdf - Accepted Version

Download (84Kb) | Preview
[img] Text
0855008_Cover.pdf - Accepted Version
Restricted to Repository staff only

Download (119Kb)
[img]
Preview
Text
0855008_References.pdf - Accepted Version

Download (84Kb) | Preview

Abstract

Many industries with same product are competing to give the best services for customer needs and satisfaction. Regarding this the company needs to maintain the quality and produce the product in the right time. In order the product can be finished in the right time, the company needs to apply scheduling method which can support goods production process. Based on above case, scheduling process implementation is needed to get more effectiveness in the production process activity while still maintaining and setting priority to the quality of the product. This observation is based on Campbell Dudek and Smith (CDS) Method because the production process used by the company has more than two series machines. Production scheduling adopted by the company is using the order of Cotton, PLTC 150cm, PLTC 180cm, 240cm PLTC, Denim, TC, Cotton Twill, Cotton Polly with the amount of time 1950.2 hours. While according to the results of the calculation using CDS, production scheduling sequence that gives the smallest amount of time is Cotton Twill, Denim, Polly Cotton, TC, PLTC 180cm, 240cm PLTC, Cotton, 150cm or Denim PLTC, TC, Cotton Twill, Polly Cotton, 180cm PLTC , PLTC 240cm, Cotton, PLTC 150cm with a time of 1861.5 hours. This conclude that using CDS Method can give more efficiency in terms of time with amount of 88.7 hours, where there will be no lateness in 4 jobs.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: scheduling machines, CDS rule, lateness
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: Faculty of Economics > 55 Management Department (Night Classes)
Depositing User: Perpustakaan Maranatha
Date Deposited: 20 Nov 2015 10:40
Last Modified: 20 Nov 2015 10:40
URI: http://repository.maranatha.edu/id/eprint/17417

Actions (login required)

View Item View Item