Analisis Aggregate Planning untuk Efisiensi Biaya Produksi di Perusahaan Kaus Kaki

H. , Stefanus Steven C. (0652079) (2010) Analisis Aggregate Planning untuk Efisiensi Biaya Produksi di Perusahaan Kaus Kaki. Undergraduate thesis, Universitas Kristen Maranatha.

[img]
Preview
Text
0652079_Abstract_TOC.pdf - Accepted Version

Download (95Kb) | Preview
[img] Text
0652079_Appendices.pdf - Accepted Version
Restricted to Repository staff only

Download (5Kb)
[img]
Preview
Text
0652079_Chapter1.pdf - Accepted Version

Download (30Kb) | Preview
[img] Text
0652079_Chapter2.pdf - Accepted Version
Restricted to Repository staff only

Download (263Kb)
[img] Text
0652079_Chapter3.pdf - Accepted Version
Restricted to Repository staff only

Download (133Kb)
[img] Text
0652079_Chapter4.pdf - Accepted Version
Restricted to Repository staff only

Download (305Kb)
[img]
Preview
Text
0652079_Conclusion.pdf - Accepted Version

Download (9Kb) | Preview
[img] Text
0652079_Cover.pdf - Accepted Version
Restricted to Repository staff only

Download (110Kb)
[img]
Preview
Text
0652079_References.pdf - Accepted Version

Download (49Kb) | Preview

Abstract

The current global economic developments requires every company to compete globally. Companies must have specific strategies in order to maintain its existence. Thus the company is expected to produce an effective and efficient that can be done by minimizing production costs, labor costs, and inventory costs. Therefore, companies can do with aggregate planning. PT. X is a company engaged in the production of socks, where the production process employed by a company is a full production capacity in each month so that a pile of socks inventories when demand was slow and caused enormous stocks which costs each month and it will cost a loss. Sometimes there is a lack of inventories when demand soaring in certain months. This study aims to determine what strategies have been applied to the company facing fluctuatif demand of socks. Each month and how an aggregate planning in production method can be use to make a better production plan which will be more efficient. Strategies used in this study using aggregate planning with the transportation method can determine the optimum amount of production for each month and can reduce the total cost Rp 227.394.093,00 comparing with the total cost if the companies use their strategies with maximum production capacity.

Item Type: Thesis (Undergraduate)
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: Faculty of Economics > 52 Management Department
Depositing User: Perpustakaan Maranatha
Date Deposited: 03 Aug 2015 03:22
Last Modified: 19 Jan 2016 06:22
URI: http://repository.maranatha.edu/id/eprint/14269

Actions (login required)

View Item View Item