Lembang, Denny Taruk (0652048) (2010) Pengaruh Pelaksanaan Pemeliharaan Mesin Pabrik terhadap Efisiensi Biaya Pemeliharaan pada PT. Rajawali Hiyoto Bandung. Undergraduate thesis, Universitas Kristen Maranatha.
|
Text
0652048_Abstract_TOC.pdf - Accepted Version Download (130Kb) | Preview |
|
Text
0652048_Appendices.pdf - Accepted Version Restricted to Repository staff only Download (3102Kb) |
||
|
Text
0652048_Chapter1.pdf - Accepted Version Download (151Kb) | Preview |
|
Text
0652048_Chapter2.pdf - Accepted Version Restricted to Repository staff only Download (442Kb) |
||
Text
0652048_Chapter3.pdf - Accepted Version Restricted to Repository staff only Download (124Kb) |
||
Text
0652048_Chapter4.pdf - Accepted Version Restricted to Repository staff only Download (541Kb) |
||
|
Text
0652048_Conclusion.pdf - Accepted Version Download (52Kb) | Preview |
|
Text
0652048_Cover.pdf - Accepted Version Restricted to Repository staff only Download (111Kb) |
||
|
Text
0652048_References.pdf - Accepted Version Download (51Kb) | Preview |
Abstract
Machine is a facility that is absolutely needed by manufacturing company in production. By using machines, production can be done efficiently and meets the plans. Machines that continuously used by the company may cause the possibility of damage, thus the machine must be repaired, and replacement or adjustments are needed to ensure the process continuity. In an effort to keep the systems equipment in working order, maintenance activities are required. Three types of maintenance activities at PT. Rajawali Hiyoto are preventive maintenance, breakdown maintenance and overhoul maintenance. a. Preventive Maintenance Preventive maintenance is maintenance activities undertaken to prevent the failure that was unexpected and keep facilities in good repair. b. Breakdown maintenance Maintenance activities that occurs after equipment fails and must be repaired. c. Overhaul Maintenance Overhaul that is activity of total maintenance or major maintenance on production machines. Based on research results that have been done by the writer on PT. Rajawali Hiyoto, the total cost of conducting preventive maintenance every six months is Rp 2,109,134, Rp 3,121,635.23 less than the total cost of the current maintenance Rp 5,230,769.23, thus the company would reasonably choose to conduct maintenance every six months.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Machine, Preventive Maintenance, Breakdown maintenance, Overhaul Maintenance, Efficiency, Maintenance Cost |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management |
Divisions: | Faculty of Economics > 52 Management Department |
Depositing User: | Perpustakaan Maranatha |
Date Deposited: | 31 Jul 2015 06:36 |
Last Modified: | 19 Jan 2016 05:37 |
URI: | http://repository.maranatha.edu/id/eprint/14247 |
Actions (login required)
View Item |